Phase I costs › Phase I vs Phase II

Phase I vs Phase II environmental site assessment

Updated November 22, 2026. Every fact and price links to the public source it comes from.

Short answer: a Phase I environmental site assessment (ESA) looks for signs of contamination, normally without sampling anything: a records search, a site visit and interviews. A Phase II takes samples (soil, soil gas, groundwater) to find out whether contamination is really there. A Phase II often follows a Phase I that found potential problems, and some lenders require one (SBA does for properties with current or former on-site solvent dry cleaning). Published prices put a typical Phase I in the low thousands of dollars. For an initial Phase II, one study of 1,602 investigations found an average of $12,785 and a range of $4,100 to $60,000; published ranges start around $5,000 to $10,000 and run past $25,000 to $100,000 or more.

Side by side

Phase I and Phase II ESA compared
TopicPhase I ESAPhase II ESA
What it does"A review of available information" with four parts: records review, site inspection, interviews and a written report; it "does not typically include any soil, water, or waste sampling or analysis" (Ohio EPA)Samples areas of suspected contamination "to confirm the presence, type and levels of contaminants" (Ohio EPA)
StandardASTM E1527-21 (ASTM) ASTM E1903-19 (ASTM)
Federal ruleEPA's All Appropriate Inquiries rule (40 CFR Part 312) names E1527-21 as a way to meet it (EPA) Not part of a standard Phase I: EPA lists "Phase II sampling and analysis" among additional services (EPA). ASTM's practice is voluntary and "may be conducted after" a Phase I or All Appropriate Inquiries review (ASTM E1903-19)
Published pricesMost California ranges $1,800–$5,000 (California cost page); $3,083 national average in a 2023 survey (LightBox EDR)$12,785 average, $4,100–$60,000, for initial investigations (Partner ESI study); see Phase II costs
Typical time16 business days on average (LightBox EDR); 2–4 weeks (DealRoom) 4–8 weeks (DealRoom); 6–12 weeks in a city grant program that includes EPA approval of the work plan (City of Longmont, CO)
What you getA written report with the environmental professional's opinion on whether there are signs of releases of hazardous substances, and any data gaps (40 CFR 312.21)Sample results for the areas tested; "no Phase II ESA can eliminate all uncertainty" (ASTM E1903-19)

What a Phase I does

A Phase I is the inquiry part of due diligence. Under EPA's All Appropriate Inquiries rule the inquiry includes interviews (40 CFR 312.23), a review of historical sources (312.24), a search for environmental cleanup liens (312.25), a review of government records (312.26) and a visual inspection of the property and adjoining properties (312.27). Done properly and on time, it is one of the steps a buyer needs to claim the federal Superfund law's landowner liability protections (EPA). More on what it covers: What is a Phase I ESA?

What a Phase II does

A Phase II tests the specific concerns the Phase I raised. "The soil, soil vapor, surface water, ground water and contents of any tanks and containers may be evaluated" (Ohio EPA). ASTM's Phase II practice, E1903-19, covers sampling for "the presence or the likely presence" of substances "including but not limited to" those within the federal Superfund law's scope (ASTM E1903-19). Its scope "is related to the objectives of the investigation" and "does not require full site characterization in every instance" (ASTM E1903-19), which is why prices range so widely: see Phase II costs.

When a Phase I leads to a Phase II

  • The Phase I found a recognized environmental condition. ASTM's Phase II practice is meant "to evaluate known releases or likely release areas identified by the user or Phase II Assessor" (ASTM E1903-19). It adds that a Phase I's decision to call an area a recognized environmental condition, or not, is "not determinative" of whether a Phase II should look at it.
  • The lender requires it. For SBA 7(a) and 504 loans, a property with dry cleaning on site, now or in the past, that "uses, used, or likely used chlorinated and/or petroleum-based solvents" needs "a Phase I followed by a Phase II Environmental Assessment" (SBA SOP 50 10 8.1). Other lenders set their own rules; ask yours before the work is scoped.
  • How often it happens. In one study, most Phase IIs found something. In a 2023 study of 1,755 properties by fifteen Environmental Bankers Association member firms, contamination was detected above laboratory reporting limits at 80% of sites and above applicable regulatory levels at 54% (EBA Journal, Winter 2024). We found no published figure for how many Phase Is lead to a Phase II.

Plan the timing

"If potential issues are identified, then a Phase II assessment is often conducted" (Ohio EPA), so allow time for both. Published times are 2–4 weeks for a Phase I and 4–8 weeks for a Phase II (DealRoom). The All Appropriate Inquiries rule also wants the Phase I done within one year before you buy, with key parts updated within 180 days (40 CFR 312.20). If your purchase contract has a due-diligence period, order the Phase I early enough to leave room for a Phase II if one is needed.

Need a Phase I?

Tell us about the property. We are collecting requests and will email you if we can match yours with an independent Phase I consultant who works in the property's state. We can't promise a reply time or a quote, and we won't pass your details to anyone without asking you first.

Request a quote

How we put this page together

We read every source linked above in November 2026 and quote it as published. Prices are what those firms and studies report, not quotes for your property. The LightBox EDR survey figures appear on LightBox's own copy of its survey page (lbrestaging.wpengine.com, linked above); the version on lightboxre.com shows only the introduction. Phase1Cost is not an environmental consulting firm and is not paid by any consultant, firm or lender named here. Spotted an error? Email hello@phase1cost.com.