Short answer: a Phase I environmental site assessment (ESA) is a report on whether a property is likely to be contaminated, based on records, the property's history, a site visit and interviews. It does not normally include sampling soil or water. It is done by an "environmental professional" following ASTM E1527-21, a standard EPA recognizes under its All Appropriate Inquiries rule. Buyers get one to qualify for protection from federal cleanup liability, and loan programs including SBA, Fannie Mae and Freddie Mac require an environmental assessment for many commercial and multifamily loans.
What a Phase I includes
The federal All Appropriate Inquiries (AAI) rule, 40 CFR Part 312, says what the inquiry must cover, and ASTM E1527-21 is an industry standard EPA recognizes for meeting it (EPA, All Appropriate Inquiries). The environmental professional's part (40 CFR 312.21):
- Interviews. The inquiry "must include interviewing the current owner and occupant of the subject property" (40 CFR 312.23).
- The property's history. Records such as "aerial photographs, fire insurance maps, building department records, chain of title documents, and land use records", going back to when the property first had structures or was first put to use (40 CFR 312.24).
- Government records for the property and the properties next to it, including storage tank records, hazardous waste records, cleanup site lists and spill reports (40 CFR 312.26). In California these include the Cortese List and the State Water Board's GeoTracker database (see the California page).
- A site visit of the property, and a look at the neighboring properties from the property line, a public road or another vantage point such as aerial photos (40 CFR 312.27).
- Local knowledge that is commonly known or easy to find, and a judgment on how obvious any contamination would be (40 CFR 312.30; 40 CFR 312.31).
The buyer has a part too (40 CFR 312.22): searching for environmental cleanup liens if the consultant does not, taking account of (and optionally sharing) any specialized knowledge, and considering "whether the purchase price of the subject property reasonably reflects the fair market value of the property, if the property were not contaminated" (40 CFR 312.29). Sampling is not part of a standard Phase I: EPA lists "Phase II sampling and analysis" among the additional services a buyer can order (EPA, All Appropriate Inquiries).
What the report tells you
The written report must give the environmental professional's opinion on whether the inquiry found "conditions indicative of releases or threatened releases of hazardous substances" on the property, identify data gaps and their significance, and state the professional's qualifications (40 CFR 312.21). In ASTM's terms the key finding is a recognized environmental condition (REC): "(1) the presence of hazardous substances or petroleum products in, on, or at the subject property due to a release to the environment; (2) the likely presence of hazardous substances or petroleum products in, on, or at the subject property due to a release or likely release to the environment; or (3) the presence of hazardous substances or petroleum products in, on, or at the subject property under conditions that pose a material threat of a future release to the environment. A de minimis condition is not a recognized environmental condition" (ASTM E1527-21).
The conclusion then says either that the assessment "revealed no evidence of recognized environmental conditions", or lists them (EPA, All Appropriate Inquiries). Reports also use two related terms. In the earlier E1527-13 wording, a controlled REC is a past release cleaned up to a regulator's satisfaction but with contamination left in place under controls (for example a leaking tank cleaned to a commercial standard, so the property must stay commercial), and a historical REC is a past release addressed to a regulator's satisfaction, or meeting unrestricted use criteria, without any required controls (Maryland Department of the Environment glossary). EPA says E1527-21 reworded all three definitions but "the concepts and ramifications of the definitions have not" changed (EPA comparison of the AAI rule, E1527-13 and E1527-21).
A Phase I gives an opinion on whether more investigation may be appropriate; a specific recommendation "is not required and falls outside the scope" of the standard (EPA comparison of the AAI rule, E1527-13 and E1527-21). That further investigation is often a Phase II: see Phase I vs Phase II.
What a Phase I does not cover
The standard covers hazardous substances under the federal Superfund law (CERCLA) and petroleum products (ASTM E1527-21). Other common concerns are extra services: EPA lists "non-scope considerations (e.g., lead-based paint, mold, radon, asbestos, regulatory compliance assessment, indoor air quality, etc.)" (EPA, All Appropriate Inquiries). ASTM says any such work should be "agreed upon between the user and environmental professional as additional services beyond the scope of this practice before initiation" of the assessment (ASTM E1527-21). Some lenders require some of them: Freddie Mac's multifamily guide requires asbestos, lead-based paint, drinking water and mold items (Freddie Mac Guide, chapter 61).
PFAS. E1527-21 leaves out "emerging contaminants" that are not CERCLA hazardous substances, such as PFAS, but EPA's 2022 comparison says they must be evaluated once they are defined as hazardous substances (EPA comparison of the AAI rule, E1527-13 and E1527-21). EPA designated two PFAS, PFOA and PFOS, as CERCLA hazardous substances effective July 8, 2024 (EPA, PFOA and PFOS designation). We found no later EPA or ASTM statement on PFOA and PFOS in Phase I scope, so ask your consultant how the report treats them.
Why buyers get one: federal liability protection
Under the federal Superfund law, "liability for environmental contamination may be assigned based solely on property ownership" (EPA, All Appropriate Inquiries). The law protects three kinds of owners: bona fide prospective purchasers, contiguous property owners and innocent landowners (EPA, landowner liability protections). Each must have performed all appropriate inquiries before purchasing the property (EPA, common elements guidance); EPA's rule recognizes a Phase I under E1527-21 as a way to do that. A bona fide prospective purchaser "may purchase property with knowledge of the contamination and still be eligible for the liability protection"; the other two cannot know, or have reason to know, of it (EPA, common elements guidance).
The protections are "self-implementing": no EPA or court approval is needed, only meeting the law's requirements (EPA, landowner liability protections). All appropriate inquiries are only one of them. After buying, owners have continuing obligations, including "taking 'reasonable steps to prevent releases'", complying with land use restrictions and cooperating with cleanup (EPA, common elements guidance); ASTM notes its practice "does not address whether requirements in addition to all appropriate inquiries have been met" (ASTM E1527-21). EPA says the rule matters to "commercial and government entities purchasing property, and all individuals purchasing property for non-residential use" who may later seek this protection (EPA, All Appropriate Inquiries).
Who needs one
- Buyers of commercial property who want the federal landowner liability protections described above.
- SBA 7(a) and 504 borrowers. SBA requires an environmental investigation of all commercial property pledged as collateral. It must start with a Phase I for businesses in environmentally sensitive industries on SBA's list and for gas stations, whatever the loan amount; for other loans over $250,000 a Phase I is needed when the required Records Search with Risk Assessment finds anything other than "low risk" (SBA SOP 50 10 8.1, effective October 1, 2026).
- Multifamily borrowers. Fannie Mae requires a Phase I of the entire property meeting the current ASTM E1527 (Fannie Mae Guide 504.01), and Freddie Mac requires an environmental report before it issues a commitment (Freddie Mac Guide, chapter 61). HUD requires Phase I ESAs on new applications after February 13, 2024 to conform to E1527-21 (HUD memo).
- Users of EPA brownfields grants. "Every Phase I environmental site assessment conducted with EPA Brownfields Assessment Grant funds must be conducted in compliance with the AAI Final Rule" (EPA, All Appropriate Inquiries).
- Buyers relying on California's own protections. Under California's Land Reuse and Revitalization Act, a bona fide purchaser, innocent landowner or contiguous property owner must show that "on or before the date on which the person acquired the site, the person made all appropriate inquiries into the previous ownership and uses of the site" (Health and Safety Code 25395.80). For most property the Act defines those inquiries as compliance with EPA's federal standards, with any engineering or geology work done under California law; homes of four or fewer units bought by a noncommercial owner have a simpler test (HSC 25395.65).
Some lenders order the report themselves: Live Oak Bank says that "in most cases, Live Oak will order this report on your behalf" (Live Oak Bank). Ask your lender before you order one.
Who can do one
The inquiry must be done by, or under the supervision of, an "environmental professional" as federal rules define one: someone with a current Professional Engineer's or Professional Geologist's license and 3 years of full-time relevant experience; or a government license or certification to perform environmental inquiries and 3 years; or a bachelor's or higher degree in engineering or science and 5 years; or 10 years of full-time relevant experience (40 CFR 312.10). The professional signs a declaration in the report that they meet that definition (40 CFR 312.21). The federal definition "does not preempt state professional licensing or registration requirements" (40 CFR 312.10). Fannie Mae and Freddie Mac both require a professional who meets it (Fannie Mae Guide 504.01; Freddie Mac Guide, chapter 61).
How long a Phase I stays valid
For the federal protections, the inquiry must be done within one year before you acquire the property, and five parts (interviews, the lien search, the government records review, the site visit and the environmental professional's declaration) must be done or updated within 180 days before the acquisition (40 CFR 312.20). SBA accepts an otherwise compliant Phase I dated within one year of the SBA loan number (SBA SOP 50 10 8.1).
ASTM E1527-21: what changed from E1527-13
ASTM published E1527-21 in November 2021. EPA's rule recognizing it took effect February 13, 2023, and the older E1527-13 stopped counting on February 13, 2024 (87 FR 76578; 40 CFR 312.11). EPA says "there are no legally significant differences" between its rule and E1527-21 (87 FR 76578). EPA's own comparison lists what the new version changed (EPA comparison of the AAI rule, E1527-13 and E1527-21):
- Reworded definitions of REC, historical REC and controlled REC, with the same concepts.
- New or clarified terms, including "significant data gaps", "likely", "presumed viability" and "review of land title records".
- Historical research: aerial photographs, fire insurance maps, local street directories and historical topographic maps "must be reviewed if they are reasonably ascertainable, likely to be useful, and applicable", and should also be reviewed for adjoining properties when they cover them.
- The report adds a site plan and photographs, lists significant data gaps in its findings, and lists all RECs, controlled RECs and significant data gaps in its conclusions.
- Emerging contaminants such as PFAS are outside the scope until defined as CERCLA hazardous substances (see above).
A quote that still offers E1527-13 is out of date. Forestland and rural property have their own standard, ASTM E2247-23, which EPA also recognizes (89 FR 52386).
What it costs
Most published California ranges for a standard Phase I on a single commercial property fall between $1,800 and $5,000 (California page), and LightBox EDR's 2023 survey found a $3,083 national average (LightBox EDR, on LightBox's own copy of its survey page); complex sites cost more. Every price and its source is on the California cost page and the national page. If the Phase I finds a likely problem, the next step is often a Phase II: see Phase I vs Phase II and Phase II costs.
Need a Phase I?
Tell us about the property. We are collecting requests and will email you if we can match yours with an independent Phase I consultant who works in the property's state. We can't promise a reply time or a quote, and we won't pass your details to anyone without asking you first.
How we put this page together
We read the federal rules, agency pages and lender guides linked above in November 2026 and quote them as published. ASTM E1527-21 itself is a paid standard; where we describe its contents we rely on the public sources linked. This is general information, not legal advice. Phase1Cost is not an environmental consulting firm and is not affiliated with ASTM, EPA, SBA or any lender. Spotted an error? Email hello@phase1cost.com.