Property condition assessment cost

Updated November 22, 2026. Every price below links to the public page it comes from.

Short answer: California public contracts show what agencies agreed to pay. The San Diego Housing Commission's 2024 contract priced each of 150 housing properties at $2,100 to $2,900, and the Richmond Housing Authority approved up to $10,430 for one public-housing site in 2025. One published guide puts a property condition assessment (PCA) of a single property at $3,000 to $8,000; another, which calls its figures illustrative, gives $4,000 to $8,000 for a building under 100,000 sq ft and $8,000 to $15,000 for a 200,000 sq ft office. The price follows the number of buildings and units, building size and the lender's format.

PCA prices from public contracts

Property and facility condition assessment prices in California public records
AgencyPriceWhat it covers
San Diego Housing CommissionContract with Partner Engineering and Science, September 2024$2,100
$2,400
$2,700
$2,900
Per property, 150 properties (2,400 units), $336,600 in total: single-family and small 2-building sites; 1–4 buildings; more buildings or more units; "higher unit count and 10+ buildings"
Richmond Housing AuthorityResolution 2211, May 2025Up to $10,430Physical needs assessment of one public-housing property, Nystrom Village (Bureau Veritas)
City of Fresno2014; dated$38,860Facility condition assessment of a city service campus: 19 buildings (218,644 sq ft), 10 shelters and 5 parking lots
City of FresnoDecember 2024$137,500
+ $10,000 contingency
Facility condition assessment of five parking garages and eleven surface lots in the Downtown and Tower District areas

Housing agencies call these reports physical needs assessments (PNA) and cities call them facility condition assessments (FCA); they are similar condition reports, but none of these says it follows ASTM E2018. The San Diego prices are bulk rates for a portfolio of mostly simple residential sites, which may explain why they are below the guide ranges; no source says so.

Published guide ranges

Published PCA price ranges
SourcePriceWhat it covers
PapermarkDeal-room software blog, 2026; names no sources$3,000–$8,000"a single stabilised asset"
ApersSays its figures are "illustrative cost assumptions (not published fee data)"$4,000–$8,000
$8,000–$15,000
Single building under 100,000 sq ft; a 200,000 sq ft suburban office

We found no published price for a seismic (probable maximum loss) add-on or a rush fee, and no source that compares California with national PCA prices, so we give none.

What makes a PCA cost more

  • Number of buildings and units. San Diego's fee tiers step up from "small 2-building sites with low unit count" to "higher unit count and 10+ buildings" (SDHC).
  • Accessibility checks. The same tiers count observed ADA parking spaces.
  • Building size. One guide's illustrative figures step up from $4,000 to $8,000 for a single building under 100,000 sq ft to $8,000 to $15,000 for a 200,000 sq ft office (Apers).
  • The lender's format. Fannie Mae requires lenders to "comply with Form 4099, and order all applicable PCA modules" (Fannie Mae Multifamily Guide, section 404).
  • Follow-up work. If the engineer recommends a deeper structural study, one guide says to budget $10,000 to $50,000 on top (Apers, illustrative).

What a PCA is (ASTM E2018)

The standard is ASTM E2018-24. Its purpose is "to provide a framework for conducting a property condition assessment (PCA) of the primary improvements at commercial real estate properties by performing a walk-through survey and conducting research", and the goal "is to identify and communicate material physical deficiencies to a user". The report "includes opinions of costs for suggested remedies of observed physical deficiencies" (ASTM E2018-24). It is a voluntary guide, and ASTM notes that users' "objectives, risk tolerance, schedule, and budget" differ, so there are "varying levels of PCA".

When a lender requires one

Fannie Mae multifamily lenders must "complete a PCA for each Property" before the commitment date, and a PCA report "may be dated up to 12 months before the Commitment Date" if a site visit is done within 90 days of it (Fannie Mae Multifamily Guide, section 404).

Ordered with a Phase I

A PCA is often ordered with a Phase I environmental site assessment and an ALTA survey. "The buyer, at a minimum, should consider obtaining" these reports, one law firm advises (Burke, Warren, MacKay & Serritella). Older buildings may also need an asbestos survey before renovation.

Need a PCA quote?

Describe the property and your deadline. We are collecting requests and will email you if we can match yours with an independent building assessor who works in the property's state. No promised reply or quote, and nothing is shared without asking you first.

Request a quote