Phase I environmental site assessment cost in Sacramento

Updated November 22, 2026. Every price below links to the public page it comes from.

Short answer: no Sacramento consultant or public agency that we could find publishes what a Phase I costs in Sacramento, so the honest guide is the California range: most published prices for a standard commercial Phase I fall between $1,800 and $5,000, and federal agencies paid $3,945.86 to $4,675.00 for single California sites in 2017–2023. The local history a Sacramento Phase I has to consider includes the Railyards groundwater plumes under downtown, the Aerojet site near Rancho Cordova and the former McClellan and Mather air bases.

What a Phase I costs in Sacramento

We searched the City and County of Sacramento's agenda records, local consultants' websites and federal contract data for a Sacramento Phase I price, and found none we could rely on. The City buys this work through an on-call list of pre-qualified firms: "When professional services are required, City staff will prepare a scope and issue a request for proposals to the pre-qualified consultants", so each job is priced separately and the price is not in the Council file (City Council file 2025-00695, staff report text). None of the Sacramento-area firms we checked publish a price.

So the guide is the California range on our California cost page: most published ranges for a standard commercial Phase I fall between $1,800 and $5,000, one San Francisco firm advertises $1,495 flat, and four Phase Is that federal agencies bought for single California sites in 2017–2023 cost $3,945.86 to $4,675.00. The only federal Phase I we found with a Sacramento County place of performance is a 2010 National Park Service order for $3,085.00 that says only "PHASE I ESA" (USAspending.gov); it names no site, the place-of-performance field (Fair Oaks) sometimes holds the contractor's office rather than the property, and it predates the current standard, so it says little about Sacramento prices today.

Partner ESI, a national firm with a Sacramento page, says a Sacramento Phase I "often takes a few weeks to complete" (Partner ESI).

What a Sacramento Phase I has to look at

The Railyards plumes under downtown

Two groundwater plumes come from the former Southern Pacific / Union Pacific Railyards. The City's Railyards environmental report says the South Plume "extends from the RSP Area beneath downtown Sacramento to approximately Q Street to the south, 5th Street to the west, and 12th Street to the east", with groundwater and soil vapor cleanup under way, while the Lagoon Plume extends "slightly north past North B Street" (City of Sacramento, Railyards Specific Plan EIR, 2016). For a downtown or Railyards-area property, expect the Phase I to discuss these plumes and whether vapor could reach the site; that review can add scope.

Superfund sites in Sacramento County

Four Sacramento County sites are still on EPA's National Priorities List: Aerojet General Corp. in Rancho Cordova, McClellan Air Force Base (groundwater contamination), Mather Air Force Base and the Sacramento Army Depot; Jibboom Junkyard was deleted in 1991 (EPA NPL dataset, last edited September 2026). At Aerojet, rocket work used solvents such as TCE and PCE and "solid rocket propellant – mostly ammonium perchlorate", and the site has "approximately 350 potential source areas in various stages of investigation and remediation" (Central Valley Water Board). Properties east of Rancho Cordova and near the former bases are where these come up.

A local example: from Phase I to cleanup

Between 2013 and 2025 the Sacramento Housing and Redevelopment Agency completed Phase I and Phase II assessments and cleanup plans for DTSC on a former industrial and railroad site on Sproule Avenue, including a Phase I in September 2016 "prior to acquisition". The investigations "identified elevated concentrations of lead, arsenic, and thallium in near-surface soils" (SHRA draft EPA grant application). The Phase I is the cheap first step; what it finds decides the rest of the budget.

Where the local records are

  • Sacramento County Environmental Management Department (EMD) oversees soil and groundwater cleanups, mostly leaking underground fuel tanks, and says other contaminants it sees include "lead, chromium, dry cleaning solvents, industrial degreasing agents, and pesticides" (EMD Site Assessment & Mitigation). Cases are on the State Water Board's GeoTracker.
  • EMD files are requested on the County's NextRequest portal. The County usually answers within 10 days and may take a 14-day extension; "Emailed records are free of charge", and paper copies are "generally $ .25 per page" (EMD records requests). Ask early if you are on a tight closing date.
  • If a Phase II follows: EMD bills $232 an hour for 2026–27, and a permit for site-assessment soil borings or soil-vapor probes near groundwater is $1,154 (EMD fee schedule 2026–27). These are County fees, not the consultant's price.

City help with brownfield sites

The City of Sacramento's brownfields program says that of a $400,000 EPA grant awarded in 2009, "$328,000 has been allocated to conduct site assessments at no cost to the applicant" (City of Sacramento Brownfields). That grant is old and the money may be spent, but if your site is a vacant or underused property with a contamination question, ask the program before you pay for a Phase I.

Rules, lenders and Phase II

What a Phase I must include (ASTM E1527-21), when SBA, Fannie Mae and Freddie Mac loans require one, how long a report stays usable, cheaper screening reports and Phase II prices are the same across California; they are on the California cost page.

Need a Phase I in Sacramento?

Tell us about the property. We are collecting requests and will email you if we can match yours with an independent California Phase I consultant. We can't promise a reply time or a quote, and we won't pass your details to anyone without asking you first.

Request a quote

How we put this page together

We read every source linked above on November 21, 2026 and quote numbers as published, with no averaging. We looked for a Sacramento price in the City's council records, Sacramento County, SMUD, SacRT and SHRA documents, local consultants' websites and federal contract data, and found none beyond the 2010 award shown, so this page uses California-wide figures and says so. The Railyards plume description is from 2016; ask the consultant for the current status. Phase1Cost is not paid by any firm named here. Spotted an error? Email hello@phase1cost.com.