Short answer: we found no published price for a Phase I in San Francisco specifically. Published California price ranges for a standard commercial Phase I run $1,800 to $5,000, and one San Francisco firm advertises $1,495 flat nationwide. What is different in San Francisco is the Maher Ordinance: if your project needs a building permit, is in the Maher Area and disturbs 50 cubic yards of soil (or changes to a residential or sensitive use), the Phase I becomes the City's "Site History Report", the Health Department charges a $1,020 application fee plus $340 an hour (2026–27), and the City warns the steps "can take months".
What a Phase I costs in San Francisco
San Francisco agencies buy environmental work through multi-year as-needed contracts that do not price a single Phase I, and we found no San Francisco consultant that publishes a San Francisco price. These are the published figures that apply:
| Source | Amount | What it covers |
|---|---|---|
| Compyle EnvironmentalSan Francisco firm, its own nationwide price | $1,495 flat | Standard-scope Phase I in 5 business days; +$400 for 3 business days |
| Geo ForwardConsultant with a Bay Area office; California page | $2,000–$4,500 | Typical Phase I; small sites $2,000–$3,000, medium $3,000–$4,500 |
| RSB EnvironmentalNational consultant, California page | $2,000–$5,000 | Phase I in California, general range |
| SF Department of Public HealthCity fee, July 2026 to June 2027 | $1,020 + $340/hour | Site Mitigation (Maher) application fee and caseworker rate; on top of the consultant's price |
| SF Department of Building InspectionCity fee | $379 | 3R report (residential building permit history) per residential building, issued in 7–10 business days |
More California prices, rush fees and what raises a price are on the California cost page.
The Maher Ordinance (Health Code Article 22A)
When it applies
The Health Department's Site Mitigation Program says the Maher Ordinance applies when your project will need a building permit, is "in the Maher Area or otherwise is suspected to have contamination", and either "will disturb 50 cubic yards of soil" or "includes a change to a residential or sensitive use" (SF DPH, check your conditions). Whether a parcel is in the Maher Area is a layer on the Planning Department's Property Information Map (SF Planning, Maher map).
Your Phase I is the Site History Report
The first Maher submittal is a Site History Report, and the City says "A Phase I Environmental Site Assessment (Phase I ESA) meeting the ASTM E1527-21 standard satisfies this requirement". It must be prepared by an environmental professional and "must include the certifications required in Health Code Article 22A.6" (SF DPH, site mitigation submittals). So if your property may be redeveloped, tell the consultant up front that the report must meet Maher; a Phase I written only for a lender may need to be redone or amended.
Timing and the building permit
Maher requirements must be met "prior to submitting a building permit application to DBI", and the City advises: "Plan ahead and start these steps early, as they can take months to complete" (SF DPH, perform site assessment and mitigation). The same page says the requirements may be waived for a site "continuously used for residence since 1921" with no evidence of contamination; a 3R report, Sanborn maps and earlier reports are among the documents that can support a waiver (SF DPH).
What can follow
If the Phase I finds recognized environmental conditions, the next Maher step can be a subsurface investigation work plan, which the City notes is "sometimes called ... a Phase II ESA work plan" (SF DPH). For scale only: a 2020 draft cost estimate posted by the City for 1979 Mission Street, a site with a former dry cleaner and lead in the soil, put the Maher work at $1,755,000 in total: $30,000 for more testing, $20,000 for agency work and reports, $5,000 for construction oversight and $1,700,000 for soil disposal (AEI Consultants draft estimate, 2020). That is one large redevelopment, not a typical cost; the Phase I itself is a small part of the bill.
A claim that the City's pages don't support: at least one national consultant's page says the Health Department requires a Phase I for every commercial sale in San Francisco. The Site Mitigation Program's own pages tie Maher to building permits and soil disturbance or a change to a sensitive use, not to sales. For a sale or a loan, the buyer and the lender decide whether a Phase I is needed (see lender requirements).
Other San Francisco factors
- Hunters Point Naval Shipyard: operated from 1939 to 1974 and on the National Priorities List since 1989; the City lists contaminants including petroleum fuels, pesticides, heavy metals, PCBs, volatile organic compounds and radionuclides, and native soil with naturally occurring asbestos (SF DPH, Hunters Point Shipyard cleanup). Soil work on the shipyard parcels falls under a separate ordinance, Health Code Article 31 (SF DPH).
- Voluntary oversight: the Health Department says it is "unable to accept new Voluntary site assessment cases at this time" and points owners to DTSC or the San Francisco Bay Regional Water Board (SF DPH). Most Regional Board cleanups are voluntary, with the responsible party paying the Board's oversight costs (SF Bay Regional Water Board).
- Building records: the 3R report covers only residential building permits; "It does not include plumbing, electrical, or commercial permits", which need a separate public records request (DBI).
Rules, lenders and Phase II
What a Phase I must include (ASTM E1527-21), when SBA, Fannie Mae and Freddie Mac loans require one, how long a report stays usable, cheaper screening reports and Phase II prices are the same across California; they are on the California cost page.
Need a Phase I in San Francisco?
Tell us about the property. We are collecting requests and will email you if we can match yours with an independent California Phase I consultant. We can't promise a reply time or a quote, and we won't pass your details to anyone without asking you first.
How we put this page together
We read every source linked above on November 21, 2026 and quote numbers as published, with no averaging. We looked for a San Francisco Phase I price in Board of Supervisors records, Public Works, SFPUC, Port, TIDA and OCII contracts and local consultants' websites; the agency contracts cover many services and do not price one Phase I, so this page uses California-wide figures and says so. City fees change each July. Phase1Cost is not paid by any firm named here. Spotted an error? Email hello@phase1cost.com.